72 Loyang Way
A waterfront offshore-marine support base off Loyang Way, built around a 142-metre jetty and heavy fabrication sheds.
Street-level view near 72 Loyang Way, Singapore 508762. Imagery: Google Street View (user-contributed imagery), accessed August 2026.
Project Overview
Location & Connectivity
72 Loyang Way sits at the coastal edge of the Loyang Industrial Estate in Singapore’s east, a stretch long associated with aerospace maintenance, marine engineering and offshore support services because of its proximity to both Changi Airport and open water. The estate’s waterfront lots are relatively scarce, and 72 Loyang Way is one of a small number with direct jetty access approved by the Maritime and Port Authority, which sets it apart from the more typical landlocked B2 sheds found elsewhere in Singapore’s industrial belt.
Road connectivity is currently the site’s main lifeline rather than rail. Loyang Way feeds onto Loyang Avenue, which connects quickly to the Tampines Expressway (TPE) and onward to the Pan-Island Expressway (PIE), giving trucks and heavy plant a direct run to Changi Airport, the Changi Business Park corridor and the rest of the island. There is no MRT station within convenient walking distance today; the planned Loyang station on the Cross Island Line, targeted to open around 2030, would eventually improve rail access for staff, though occupiers should plan around road-based commuting and logistics in the interim.
Nearby amenities lean industrial and institutional rather than retail: the SIA Supplies Centre, Changi Logistics Centre and Airport Logistics Park of Singapore all sit within the immediate vicinity, reflecting the estate’s role as a support cluster for Changi Airport’s aviation and cargo operations. For workers based on site, NTUC Downtown East and Loyang Point shopping mall are a short drive away, along with residential pockets around Pasir Ris and Loyang that supply the estate’s workforce.
Location of 72 Loyang Way. Map data: Google Maps, accessed August 2026.
Building & Facilities
The complex is built around two ancillary office blocks of three and four storeys, sitting alongside a separate four-storey workers’ dormitory rated for up to around 160-200 beds — a configuration aimed squarely at operators running labour-intensive fabrication or vessel-support work rather than conventional office tenants. Two high-ceiling, single-storey production workshops anchor the production side of the site, each fitted with overhead gantry cranes (two rated at 20 tonnes and two at 30 tonnes), suited to heavy steel fabrication, module assembly and marine equipment overhaul.
Beyond the workshops, the facility includes a dedicated blasting and spray-painting chamber, a single-storey warehouse, hardstanding/open yard space, and the signature asset of the site: a jetty with 142 metres of sea frontage rated for 80kN/sqm floor loading, positioning it as a fully-integrated offshore supply base. Power infrastructure is correspondingly heavy-duty, with dual 1,500A low-tension incoming supplies approved for up to 2,000kVA, alongside 40-footer container access and dedicated loading/unloading bays.
Because this is an existing, previously tenanted industrial-marine facility rather than a new-build strata development, prospective buyers or tenants should independently verify current JTC land-use conditions, the validity and transferability of MPA jetty approvals, environmental permits tied to blasting and spray-painting operations, and the building’s maintenance history before committing, since heavy industrial fit-outs of this kind carry more site-specific due-diligence requirements than a typical office or light-industrial unit.
Unit Types & Floor Plan Notes
72 Loyang Way is not strata-subdivided; it functions as a single integrated facility historically leased or sold as a whole. For planning purposes, the site is best understood as four functional components, summarised below, which a buyer or master tenant would typically take on together rather than piecemeal.
3- & 4-Storey Blocks
Two linked office blocks providing administrative, project management and site-supervision space for the operator running the facility below.
Heavy Fabrication Workshops
Two single-storey, high-ceiling sheds with 20- and 30-tonne overhead cranes and 20kN/sqm floor loading for structural steel and module work.
Blasting Chamber & Warehouse
A dedicated blasting and spray-painting chamber plus a single-storey warehouse for surface treatment, coating and materials storage.
4-Storey Workers’ Dormitory
On-site housing for the facility’s workforce, a practical feature for operators running round-the-clock marine or fabrication schedules.
Investment Case
72 Loyang Way’s investment story hinges on the trade-off between a genuinely rare waterfront asset and a JTC land lease that is now noticeably shorter than it was at the property’s last institutional sale. The following weighs what makes the site attractive against the constraints a buyer or tenant needs to factor in.
What Works
- A rare MPA-approved jetty with 142m of sea frontage, difficult to replicate on other industrial sites
- Heavy-duty power supply and floor loading suited to niche marine, offshore and fabrication tenants
- Proximity to Changi Airport and an established aerospace/marine servicing cluster
- A track record of institutional (REIT) ownership, which points to a professionally maintained asset base
- Whole-building control suits owner-occupiers wanting a dedicated, purpose-built operational base
What to Weigh Carefully
- A remaining JTC lease of roughly 12 years significantly limits financing tenor and the pool of interested buyers
- The site’s niche, largely single-tenant nature makes backfilling or subletting harder if an operator exits
- Offshore marine and oil & gas demand is cyclical and has previously weighed on occupancy at this address
- JTC’s anchor-tenant GFA occupancy requirements constrain how freely the space can be subdivided or sublet
- No MRT access today means the site depends heavily on road and vehicle-based connectivity
Who This Suits
72 Loyang Way is best suited to offshore marine engineering firms, oil & gas fabrication or servicing operators, and shipping or logistics businesses that specifically need private jetty access and heavy-lift workshop space rather than generic warehousing. It would also suit an owner-occupier looking to consolidate marine or heavy fabrication operations onto a single waterfront site with room for staff accommodation on the same premises. It is a poor fit for short-term investors, businesses needing flexible strata-titled space, or any occupier whose operations do not genuinely require jetty access, given the shortening lease runway and the facility’s specialised, single-use character.