Nordcom II
A 2018-built B1 light industrial development in Sembawang, held on a fixed 30-year lease from 2014.
Street-level view of Nordcom II, 2 Gambas Crescent. Imagery: Google Street View (user-contributed imagery), accessed August 2026.
Project Overview
Location & Connectivity
Nordcom II sits along Gambas Crescent within the established Sembawang industrial estate, positioned roughly between Woodlands and Sembawang town. Its location lets occupiers draw on synergies from two nearby growth nodes — the Woodlands Regional Centre to the west and the Seletar Regional Centre and Seletar Aerospace Park to the east — without sitting directly inside either precinct’s premium rental band.
The nearest MRT stations are Sembawang (NS11) and Admiralty (NS10) on the North-South Line, each a walkable but not immediate distance from the development, with bus services covering the gap. Road access runs via the Seletar Expressway and Bukit Timah Expressway, and the future North-South Corridor is expected to shorten north-south travel times further once operational, a genuine long-term connectivity upside for occupiers here today.
Everyday amenities are modest but adequate: Sun Plaza and Sembawang Shopping Centre serve the wider estate, while Nordcom II’s own ground-floor canteen cluster covers daily meals for the on-site workforce without requiring a drive out. This is a functional industrial catchment rather than a lifestyle destination, which suits its occupier base.
Location of Nordcom II. Map data: Google Maps, accessed August 2026.
Building & Facilities
Nordcom II was completed in 2018 by Far East Organization and comprises four blocks with 347 strata units in total — 345 industrial units and 2 canteen units, one of which has been amalgamated into a roughly 5,300 sq ft food court housing about seven stalls and a beverage kiosk. Formats span ramp-up, flatted and 3-storey terrace factory units.
Common facilities lean toward daytime workforce wellbeing rather than residential-style living: a rooftop garden, BBQ pavilion, basketball court and swimming pool are on site, alongside an on-site childcare centre operated by MindChamps. These are unusual inclusions for a B1 development and are a point of differentiation from older, more utilitarian industrial stock in the area.
Buyers should independently verify permitted B1 use with URA before any fit-out or change of business activity, confirm the unit’s handover condition with the seller, and request the MCST’s latest accounts and maintenance schedule, since the entire development shares a single 2014 lease commencement date regardless of which unit is being purchased.
Unit Types & Floor Plan Notes
Nordcom II offers four broad configurations across its four blocks, with unit sizes ranging from about 1,636 sq ft to 5,888 sq ft. Ground-floor ramp-up units suit businesses needing direct vehicle access, upper-floor flatted units suit lighter, more office-like operations, and a small terrace and F&B cluster round out the mix.
≈1,636 – 2,013 sq ft
Ground-floor units with direct vehicle ramp access, suited to light assembly, warehousing or businesses needing frequent loading and unloading.
≈1,668 – 3,336 sq ft
Multi-storey units served by passenger and cargo lifts, suited to design, R&D, light manufacturing or office-style operations.
≈3,000 – 5,888 sq ft
Standalone terrace-format units with their own frontage and loading bay, suited to businesses wanting greater operational independence.
≈2,616 – 2,713 sq ft (amalgamated)
Ground-floor food court cluster housing about seven stalls and a beverage kiosk, serving the on-site daytime workforce.
Investment Case
As a 2018-completed B1 development on a 30-year lease from 2014, Nordcom II occupies a specific niche in Singapore’s industrial market: entry prices are accessible relative to freehold or 60-year leasehold alternatives, but the shortening tenure is the single biggest variable buyers need to underwrite before committing.
What Works
- Entry PSF meaningfully below freehold or longer-leasehold B1 stock in the north region, widening the buyer pool at this price point.
- Purpose-built amenities — pool, BBQ pavilion, childcare — that support daytime workforce retention, unusual for an industrial development.
- Strong current connectivity via SLE/BKE, with the future North-South Corridor expected to improve journey times further.
- An active, functioning MCST across 347 units, spreading maintenance costs over a reasonably large base.
- Mixed unit formats give owner-occupiers flexibility to match space to operational needs.
What to Weigh Carefully
- Only around 18 years remain on the 30-year lease from 2014, narrowing financing tenure and the resale pool as it decays.
- Short-leasehold industrial assets typically see steeper value decline in their final third of tenure.
- B1 restrictions limit occupiers to clean and light industry — not general office or retail use.
- As a single-use industrial estate, immediate surroundings offer fewer lifestyle amenities than mixed-use precincts.
- En-bloc or redevelopment is unlikely this early in the lease and should not be part of the investment thesis.
Who This Suits
Nordcom II is best suited to owner-occupiers running light manufacturing, assembly, trade or storage operations who value the ramp-up and flatted mix, and who are comfortable operating within a defined B1 lease horizon rather than planning for multi-decade ownership. It can also appeal to investors seeking industrial rental income at an accessible entry price, provided they underwrite the shortening lease into their hold-and-exit timeline rather than assuming long-term capital appreciation. It is less suited to buyers requiring general office, retail or F&B use beyond the existing canteen cluster, or to those seeking a forty-year-plus investment horizon.